YesNoOk
avatar

How to change order in "Turns" KOF style (Read 4075 times)

Started by Meatball, December 25, 2006, 05:12:59 am
Share this topic:
How to change order in "Turns" KOF style
#1  December 25, 2006, 05:12:59 am
  • ***
  • Garbage Day!
Wasn't sure what section to put his in. Let me know if its wrong.

Also not sure if this is already known because it took me a really long time to figure this out :sugoi:, I also searched and nothing came up so....

But if you pick turns mode you can switch the order of the characters you play as like in KOF, but not exactly like it.

On the versus screen simply hold left or right and press any button and you'll play as the next or last character in line.

If this is already known lock, dump, whatever. Just sharing for others who don't know.

GamerTag: Meatball01
Last Edit: December 25, 2006, 05:16:27 am by Final Suave Dude
Re: How to change order in "Turns" KOF style
#2  December 25, 2006, 04:59:27 pm
  • ****
  • Arbiter of Novel Trivia
    • USA
it actually says this somewhere in the docs --;
Re: How to change order in "Turns" KOF style
#3  January 13, 2007, 07:06:02 pm
  • All rise, I fall...
erm... which docs are they ?
P E O P L E   A R E   J O Y F U L   , T O O   J O Y F U L   T H A T   W H E N   I   S E E   T H E M   , I   B U R S T   I N T O   T E A R S   . . .
Re: How to change order in "Turns" KOF style
#4  February 15, 2007, 06:48:16 pm
  • *
I think the in-game tutorial. But I'm also not so sure.
Re: How to change order in "Turns" KOF style
#5  February 15, 2007, 06:54:53 pm
  • ***
  • Buh! Buh! Buh huh huh!
Their is no "In-Game Tutorial", but their is a doc for it.
And with that, POW! I am gone.
Re: How to change order in "Turns" KOF style
#6  February 18, 2007, 11:01:01 am
  • *
Re: How to change order in "Turns" KOF style
#7  February 18, 2007, 11:10:13 am
  • ******
And it's not in-game.
If I struggled to the end of my determination, to the end of my way of life with my followers, if the result is ruin, then this ruin is inevitable. Grieve. Shed tears. But you cannot regret.
Re: How to change order in "Turns" KOF style
#8  February 20, 2007, 06:58:53 pm
  • *
Re: How to change order in "Turns" KOF style
#9  February 20, 2007, 07:39:58 pm
  • ******
... There's still no in-game tutorial... In-game tutorial means the tutorial can be accessed from the game, not that it is a tutorial about what's "in" the game. That would be a tutorial on controls.
If I struggled to the end of my determination, to the end of my way of life with my followers, if the result is ruin, then this ruin is inevitable. Grieve. Shed tears. But you cannot regret.